| Grid connection | Import (demand) | Export (generation) |
|---|---|---|
| Distribution under 100 MW |
Fixed cost: £0
If declared as Non-Final Demand
Flexible (Triad) cost: avoidable
T-Demand locational (Triad import tariff), set by metered demand at Triad periods
|
Fixed credit: £0
Flexible (Triad) credit: available
Embedded Export Tariff (EET), varies by region. £0 in Scotland, Northern, North West and Yorkshire
|
| Transmission or distribution ≥ 100 MW |
Fixed cost: £0
If declared as Non-Final Demand
Flexible (Triad) cost: avoidable
T-Demand locational (Triad import tariff), set by metered demand at Triad periods
|
Fixed cost: £+/−
Wider generation tariffs scaled by ALF. Cost or credit by zone
Flexible (Triad) cost: £0
|