Strategies to expand existing BESS sites

Existing battery Augmentation on the existing site New stage Inverter, coloured by battery

1. Add energy capacity

New cells behind the existing connection

GridSame connection

2. Add power and energy capacity

New cells with an expanded grid connection

GridExpanded gridconnection

3. Add a new stage

A new battery site with its own grid connection

GridConnectionNew connection